You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Link to the Release Notes PR in the documentation repo (if not a comment below)
Tip
Delete any items that do not apply so that all applicable items can be checked.
For example, if you add release notes to the documentation repository, you do not need the latter two criteria.
This list should be completed by the assignee(s), once respective PRs have been merged. Once all items have been checked, the issue can be moved into Development: Done.
Acceptance
Can build image (either locally, or in CI)
Kuttl smoke tests passes (either locally, or in CI)
Release notes added to documentation and linked as a PR above
Release notes written in a comment below
Applicable release-note label added to this issue
Testing instructions
# See the latest version at https://pypi.org/project/image-tools-stackabletech/
pip install image-tools-stackabletech==0.0.13
bake --product superset=x.y.z # where x.y.z is the new version added in this PR
kind load docker-image docker.stackable.tech/stackable/superset:x.y.z-stackable0.0.0-dev
# Change directory into the superset-operator repository and update the# product version in tests/test-definition.yaml
./scripts/run-tests --test-suite smoke-latest # or similar
Please consider updating this template if these instructions are wrong, or
could be made clearer.
The text was updated successfully, but these errors were encountered:
Part of #964
4.1.1
Tip
Please add the
scheduled-for/2025-03
label, and add to the Stackable Engineering project.Update tasks
versions.py
to reflect the agreed upon versions in the spreadsheet (including the removal of old versions).superset/README.md
).superset/stackable/patches/x.y.z/.gitkeep
, add patches if applicable.Related Pull Requests
Tip
Delete any items that do not apply so that all applicable items can be checked.
For example, if you add release notes to the documentation repository, you do not need the latter two criteria.
This list should be completed by the assignee(s), once respective PRs have been merged. Once all items have been checked, the issue can be moved into Development: Done.
Acceptance
release-note
label added to this issueTesting instructions
Please consider updating this template if these instructions are wrong, or
could be made clearer.
The text was updated successfully, but these errors were encountered: